Mauritius Port Authority / Mauritius.
Client: Mauritius Ports Authority (MPA)
Location: Mauritius
Size of Project: 75,350-sf terminal and waterfront redevelopment
Construction Cost: $16.5 M
Completion date: 2025 (estimate)
Unique Features:
BA serves as the Prime Consultant, responsible for programming, master planning, urban planning, architecture, landscape architecture and interior design and is leading a team of local consultants. This is a multi-phase project that included urban planning of a new public waterfront promenade and urban core with a passenger ferry and cruise terminal as its anchor. The promenade design includes linkages to the Le Salinas downtown area, and the passenger terminal, as well as planned private development plots and public park spaces.
BA was contracted by MPA to masterplan the site and to design the anchor Passenger Terminal and waterfront promenade. The promenade and terminal are currently under construction.
Mauritius Port Authority / Mauritius.
Client: Mauritius Ports Authority (MPA)
Location: Mauritius
Size of Project: 75,350-sf terminal and waterfront redevelopment
Construction Cost: $16.5 M
Completion date: 2025 (estimate)
Unique Features: