PortMiami, Florida
Client: Norwegian Cruise Line
Size of Project: 800 Spaces – 7 Levels
Construction Cost: $27 million
Completion date: 2020
Scope of Service: Architecture, Construction Management, Landscape Architecture
BA managed and led the team of design professionals who designed and constructed a +160,000SF new terminal building, new parking
garage with valet parking area with direct access to the terminal. This is PortMiami’s first cruise terminal project to achieve the stringent LEED v4 Gold certification for building design and construction.
The gold certified terminal focuses on innovation in design and terminal operations to create a platform that optimizes energy performance, indoor air quality, water efficiencies, and maximize the use of local materials and resources.
Miami-Dade