Port Canaveral Cruise Terminal 3 Parking Garage

Canaveral Port Authority

Client: Canaveral Port Authority
Size of Project: 15,000 SF | 1,762 Spaces and 215 surface employee parking lot
Construction Cost: $34 million
Completion date: 2018
Scope of Service: Architecture, Landscape Architecture and Construction
Administration

This parking garage serves one the world’s busiest cruise ports. Entry/exit plazas minimize traffic congestion. Required a functional design with a Grade Level Ground Transportation Area including 100’s of linear curb feet for passenger pickup/drop-off. Second level has pedestrian connection to terminal.

Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur.

BERMELLOAJAMIL© 2025

Port Canaveral Cruise Terminal 3 Parking Garage

Canaveral Port Authority